Mountaire Farms Project
Project Specifications

Industry
Feed Mill

Completion Date
2019

Location
Maxton, NC
Interstates completed its largest output capacity feed mill to date in Maxton, NC, for Mountaire Farms. In charge of the electrical construction for the project, Interstates utilized prefabrication and 3D scanning to complete the project on time and with utmost accuracy.
Services Provided: Electrical Construction | Electrical Prefabrication
Key Scope Components
Prefabricated panel skids, motor disconnect stands, conduit stands, custom support pull boxes, and conduit racks.
Installation of underground conduit was maximized on this project.
Installation of prefabbed conduit rack to the top of the 200 foot feed mill created schedule savings.