A blue line icon of an industrial facility with two smokestacks, representing a manufacturing plant or processing facility. Commonly used to symbolize value-added agriculture or industrial operations.

Industry

Grain Export Terminal

Dollar Amount

$15,700,000

A blue icon showing a checklist with three checkmarks next to a clock face, representing time management, scheduling, or tracking progress over time.

Completion Date

2011

Location

Longview, WA

Interstates performed a complete design-build package for a new 120,000 bushel per hour grain export terminal facility for EGT/Bunge in Longview, Washington - the first U.S. grain export terminal constructed in over 20 years. Interstates completed electrical engineering, electrical construction, and instrumentation installation. Interstates helped EGT realize their vision for this facility by influencing the design and executing the plan with the highest level of professionalism and collaboration.

Services Provided: Electrical Construction | Electrical Engineering | Electrical Prefabrication

Key Scope Components

Interstates installed 2,259,216 feet of wire, 175,457 feet of rigid conduit, and 162,016 feet of PVC underground.

In addition, they installed and wired 1,078 light fixtures, 545 motors and 1,932 instruments.

Interstates installation included 15kv power distribution and 480V power distribution to six electric rooms throughout the facility.