Spring Forward: Expert Tips for an Effective Plant Shutdown

man in yellow ppe gear working on an iPad

January 12, 2024

As spring approaches, it’s time once again for industrial facility operators to gear up for the annual spring shutdown. This pause in regular operations is crucial for executing general maintenance and specific process improvements. Randy Mouw, Instrumentation Manager at Interstates, shares his insights on how to make the most of this opportunity. “A strategized shutdown is an investment in your plant’s future. It’s about executing maintenance and improvements with precision,” he says. The success of a spring shutdown hinges on detailed and early planning, ensuring that all aspects of the operation—from the availability of parts and equipment to workforce coordination—are meticulously considered.

Key Steps for a Successful Shutdown

  1. Scoping: Assessing Your Needs. The first step is to identify what needs to be done. Mouw advises, “Look at each area of your plant and decide whether it needs testing, repairs, replacements, or enhancements.” Any audits and electrical system or equipment testing that you need will change the scope of your shutdown and impact scheduling. Be mindful of any insurance or regulatory requirements that pertain to your facility as you consider electrical preventative maintenance and testing, arc flash studies, instrumentation calibrations and testing, hazard monitoring audits, and more. You should also think about special equipment that might be needed for certain projects. Some shutdowns require cranes, aerial lifts, generators, or even temporary HVAC, depending on the climate and time of year. Keep in mind that there will be additional people at the plant during the shutdown, and consider the extra parking and plant resources that will be needed.
  2. Planning: Detailing Each Task. Once the scope is determined, the focus shifts to planning. Mouw says, “Detailing each task, from steps to duration, is key. This helps you decide how to allocate people, materials, tools, and equipment effectively.” Planning also involves deciding the division of labor between plant personnel and external resources, ensuring the right blend of skills and expertise for each task. This will be guided by the complexity of the tasks and the specific expertise or certifications required for process improvements. “Assess what you want to achieve during the shutdown and then align your resources accordingly,” Mouw says. If you don’t have the skills in-house to perform certain types of work, make sure you are partnering with a company that is experienced in shutdowns at facilities like yours.
  3. Scheduling: Timing is Everything. The timing of a shutdown can be influenced by various factors, including parts availability, budget, and market conditions. Mouw notes, “Start planning your next shutdown as soon as the previous one concludes. This ensures you’re always ahead in your preparations and can pivot if need be.”
  4. Safety: A Top Priority. Safety is paramount. Key safety measures during a shutdown will include lockout-tagout procedures tailored to your specific equipment and plant layout. These procedures ensure that the crews running the shutdown are protected even when the plant is not necessarily in its normal operating condition. Adhering to strict safety protocols minimizes risks and ensures the protection of both personnel and equipment. Mouw says, “Implementing lockout-tagout procedures tailored to your plant’s layout and equipment is essential for a safe shutdown.”

Mouw reiterates the significance of thorough planning and the value of expert partnerships. “Having a comprehensive plan and engaging with experienced partners like Interstates can make a huge difference in the outcome of your shutdown,” he says. With these expert tips, you can navigate your spring shutdown effectively, ensuring your plant remains efficient and safe year-round. Remember, a well-planned shutdown is an investment in your facility’s future, setting you up for seamless operations and continuous improvement.