Novilla RNG Facility Project
Project Specifications
Industry
BioGas Facility
Completion Date
2025
Location
Maurice, IA
Interstates delivered the complete electrical scope for a renewable natural gas (RNG) facility that converts biogas from regional dairy digesters into pipeline-quality natural gas. The project included underground and overhead power distribution to support a large-scale digester system that captures, processes, and continuously monitors biogas to meet utility quality standards. Designed to supply approximately 450 MMBtu of renewable natural gas per day, the facility offsets a significant portion of local natural gas demand. Close collaboration with the owner ensured reliable system performance and a successful project outcome.
Services Provided: Electrical Construction | Arc Flash Study | Heat Trace Design | Prefabrication
Key Scope Components
Electrical Room Layout and Design Support:
Interstates designed electrical room layouts after construction to optimize space utilization
while maintaining code compliance.
Electrical Scope Completion Support:
The team stepped in to take over and complete electrical work at one dairy site after another
contractor was removed, keeping the project on track.
Startup Sequencing and Scheduling:
Interstates worked closely with the owner to sequence start-up activities, prioritizing critical systems to support a successful commissioning.