Biofuels Facility Project

Outside view of an energy and chemical facility.

Interstates provided a complete design-build electrical package for a 60MMGPY biodiesel facility located in Wichita, KS. This project displayed excellence on several fronts, including the innovative use of 3D scanning and building information modeling (BIM) and time savings using prefabrication.

Key Scope Components

Replaced a 75HP variable frequency drive (VFD) for a backwash pump. Replaced antiquated medium voltage switchgear with new medium voltage switchgear