Interstates provided disconnection and demolition of the existing electrical on the rail unloading system Jebro had in place at their non-aggregate asphalt loadout facility. Jebro had a second track and an unloading rack between the two tracks installed to unload railcars more efficiently. Throughout the project, there were a lot of opportunities to assist Jebro with the planning of the new electrical installation, including putting in better light fixtures.
Services Provided: Electrical Construction
Key Scope Components
Electrically disconnected and demolished existing rail unloading system.
Provided adequate lighting system for safety accessing the top of the rail cars.
Reworked heat trace circuits for new piping design.
Provided local control for easier access to operations.