Soybean Processing & Degumming Facility Project

Vertical electrical conduits neatly routed and supported along a wall and ceiling inside an industrial facility, demonstrating a clean, organized installation.

Project Specifications

A blue line icon of an industrial facility with two smokestacks, representing a manufacturing plant or processing facility. Commonly used to symbolize value-added agriculture or industrial operations.

Industry

Soybean Processing & Degumming Facility

A blue icon showing a checklist with three checkmarks next to a clock face, representing time management, scheduling, or tracking progress over time.

Completion Date

2025

location icon

Location 

Midwest

See This Resource

Interstates delivered its largest full-service project to date, providing electrical design, automation, construction, and project management for a new greenfield soybean processing and degumming facility. The team supported the client from early conceptual design through commissioning, leading the master schedule and coordinating extensively with all trades to maintain progress and safety. Proactive decisions—such as securing long-lead equipment early and using extensive prefabrication—helped overcome supply chain challenges and site congestion. Advanced technologies, including 3D modeling, scanning, simulation, and redundant network architecture, enhanced system reliability, operational performance, and start up efficiency. Nearly every Interstates discipline contributed, demonstrating strong collaboration and technical excellence throughout the project.

Services Provided: Electrical Construction | Electrical Engineering | Industrial Automation & Integration | Analytics | Networking Infrastructure | Prefabrication

Key Scope Components

Full-Service Electrical and Automation Delivery: 

Interstates provided electrical design, construction, automation, networking, instrumentation, and commissioning for the new facility.

3D Modeling, Scanning, and Prefabrication: 

Advanced modeling and scanning supported accurate installation, while extensive prefabrication reduced site congestion and rework.

Advanced Control and Network Systems: 

High-reliability solutions such as PRP redundancy, simulation testing, MPC, and smart MCCs enhanced system performance and uptime.