Oilseed Facility West Fargo, ND Project

artistic view of a cable tray outside on the side of a walkway

Project Specifications

A blue line icon of an industrial facility with two smokestacks, representing a manufacturing plant or processing facility. Commonly used to symbolize value-added agriculture or industrial operations.

Industry

Oilseed

A blue icon showing a checklist with three checkmarks next to a clock face, representing time management, scheduling, or tracking progress over time.

Completion Date

2013

Location

West Fargo, ND

Interstates performed a complete design-build electrical engineering, electrical construction, instrumentation, control engineering and panel design, and fabrication package for a client’s oilseed facility located in West Fargo, ND. The project involved expansion of the existing prep area and complete replacement of the extraction area. The facility processes oilseeds into edible oil for food processing, industrial uses, and animal feed.

Services Provided: Electrical Construction | Electrical Engineering | Instrumentation

Key Scope Components

Installed 315,303 Feet of Wire.

Installed 15,560 Feet of Cable Tray.

Installed 3,730 Feet of Rigid Conduit.

Installed 161 Motors.

Installed 381 Light Fixtures.

Installed 1465 Instruments and Control Devices.