Tyson Foods, Inc. 2012 Project

artistic view of a cable tray outside on the side of a walkway

Project Specifications

A blue line icon of an industrial facility with two smokestacks, representing a manufacturing plant or processing facility. Commonly used to symbolize value-added agriculture or industrial operations.

Industry

Meat Proteins

Dollar Amount

$3,500,000

A blue icon showing a checklist with three checkmarks next to a clock face, representing time management, scheduling, or tracking progress over time.

Completion Date

2012

Location

Council Bluffs, IA

Interstates provided electrical engineering and construction for the remodel and expansion of a Tyson Foods, Inc. ready-to-eat pepperoni processing facility. The 141,500 square foot facility included the remodel of a 71,600 square foot existing facility, along with a 69,900 square foot addition. It is one of the largest pepperoni processing plants in the world, processing over 50 million pounds of pepperoni per year.

Services Provided: Electrical Construction | Electrical Engineering | Electrical Prefabrication

Key Scope Components

Interstates installed 612,260 feet of tray cable and single conductor THHN, 80,045 feet of conduit and 3,885 feet of cable tray, which included both ladder and basket tray.

Interstates also replaced three PLC cabinets and assisted the client with updating their network system.