Hawkeye Pride Project

Aerial view of an egg-laying facility.

Project Specifications

A blue line icon of an industrial facility with two smokestacks, representing a manufacturing plant or processing facility. Commonly used to symbolize value-added agriculture or industrial operations.

Industry

Food & Beverage

Dollar Amount

$3,850,000

A blue icon showing a checklist with three checkmarks next to a clock face, representing time management, scheduling, or tracking progress over time.

Completion Date

2021

Location

Corwith, IA

Interstates provided electrical construction, electrical engineering, design, and preplanning services for the Hawkeye Pride egg-laying facility, reducing the project schedule dramatically by implementing time-saving planning and construction methods. The Corwith, IA, new cage-free barns are keeping costs down while ensuring the production of high-quality eggs. Weekly coordination meetings, open communication, and utilizing the same team from previous barns helped the work go smoothly.

Services Provided: Electrical Construction | Electrical Engineering 

Key Scope Components

The project included two buildings with four cage-free barns, as well as interstitial spaces between facilities.

Interstates installed electrical switchboards and panels in the main electric room with each barn having its own electric room for a total of seven electric rooms.

Interstates’ preplanning team and prefab shop played a crucial role in innovating for productivity and getting the schedule back on track.

Download the Document