Food & Beverage

Food Processing Facility

Tyson Foods, Inc.

Council Bluffs, IA

Interstates provided electrical engineering and construction for the remodel and expansion of a Tyson Foods, Inc. ready-to-eat pepperoni processing facility. The project included power distribution engineering; lighting; MCCs; wiring and installation of line controls and robotic equipment; the addition of a 2000 amp switch to accommodate a new 52 section MCC. This is the longest MCC that Allen-Bradley has put together in a single feed. Interstates also replaced three PLC cabinets and assisted the client with updating their network system.